PeaCOBOL
v1.3.0Complete User Guide
Scenarios

Scenario library: twelve PeaCOBOL problems solved

From estate baseline to signed evidence, step by step.

Scenario 1: Pre-migration baseline

Run inventories; hash every asset; produce evidence baseline for comparison.

Scenario 2: Db2 DDL revision review

db2-check on new DDL vs copybooks; block merge on incompatible; sign.

Scenario 3: JCL actor found with prod access in dev

Validation rejects allow-list mismatch; escalate; file audit report.

Scenario 4: SBOM for procurement review

Generate CycloneDX evidence; attach to PR; archive in evidence bundle.

Scenario 5: Release readiness gate

Full suite before release candidate; archive evidence.gz; sign.

Scenario 6: Silent copybook drift

Detect removed field; find consumers; orchestrated fix with hashes.

Scenario 7: Auditor asks for historical evidence

Retrieve signed bundle; verify check hashes; present audit log snippets.

Scenario 8: COBOL code retirement

Inventory archive candidates; verify cross-references; SBOM; retention preview.

Scenario 9: Emergency patch certificate

Sign hotfix inventory + JCL report before deploy; attach to incident review.

Scenario 10: License attestation

Sign asset inventory to support vendor licensing turn-in.

Scenario 11: Regulatory drill

Restore from archive; replay inventory; match hashes; sign attestation.

Scenario 12: Cross-team migration

Baseline in repo; each team produces evidence deltas; combine into final bundle.