Scenario library: twelve PeaCOBOL problems solved
From estate baseline to signed evidence, step by step.
Scenario 1: Pre-migration baseline
Run inventories; hash every asset; produce evidence baseline for comparison.
Scenario 2: Db2 DDL revision review
db2-check on new DDL vs copybooks; block merge on incompatible; sign.
Scenario 3: JCL actor found with prod access in dev
Validation rejects allow-list mismatch; escalate; file audit report.
Scenario 4: SBOM for procurement review
Generate CycloneDX evidence; attach to PR; archive in evidence bundle.
Scenario 5: Release readiness gate
Full suite before release candidate; archive evidence.gz; sign.
Scenario 6: Silent copybook drift
Detect removed field; find consumers; orchestrated fix with hashes.
Scenario 7: Auditor asks for historical evidence
Retrieve signed bundle; verify check hashes; present audit log snippets.
Scenario 8: COBOL code retirement
Inventory archive candidates; verify cross-references; SBOM; retention preview.
Scenario 9: Emergency patch certificate
Sign hotfix inventory + JCL report before deploy; attach to incident review.
Scenario 10: License attestation
Sign asset inventory to support vendor licensing turn-in.
Scenario 11: Regulatory drill
Restore from archive; replay inventory; match hashes; sign attestation.
Scenario 12: Cross-team migration
Baseline in repo; each team produces evidence deltas; combine into final bundle.