Part IV — Expert Production Engineering · Chapter 21 · Lesson 4 of 6 · 2 min read
Lesson 4: Graceful Reloads, Deployment Plans, and Automatic Rollback
Lesson level: Expert
Purpose: Reloading a model and authorizing a deployment are separate actions. Safe routing requires verified artifacts, retained rollback targets, controlled updates, and an explicitly operated alert loop.
Learning Objectives
- Explain the shipped mechanisms and their integration boundaries.
- Design a controlled success path and a failure path.
- Produce repeatable operational evidence.
4.1 Concepts
A safe replacement is loaded and verified before traffic routing changes. ResilientRuntime.reload loads pipeline JSON and adds the version to runtime dictionaries; it does not itself authenticate the artifact, coordinate replicas, drain old work, or guarantee an atomic governance transaction. switch_plan changes the routing plan. Keep old pipelines available until in-flight work and the rollback window are complete. These host requirements turn low-level methods into a controlled deployment.
4.2 Annotated Example
Verified host sequence: verify candidate signature and hashes; load and smoke-test the candidate; call reload with an approved path; then switch_plan to an approved DeploymentPlan. rollback_on_alerts switches to rollback_version only when should_rollback finds an open critical-severity alert and a rollback version is configured. An alert flag alone is not an autonomous monitoring loop: the application must evaluate and deliver alerts.
4.3 Guided Practice
Trace an invalid candidate, a valid candidate before routing, a canary with an open critical alert, and an acknowledged alert. Predict the active version after each step.
4.4 Common Mistakes
Do not overwrite the only good artifact, use unverified paths in reload, acknowledge a critical alert merely to suppress rollback, or assume dictionary updates synchronize replicas.
4.5 Hands-On Lab
- Load two supported fixture pipelines under distinct versions and retain their digests.
- Reject a deliberately invalid replacement before any routing update.
- Exercise a canary plan, inject an open critical alert, and invoke rollback handling.
- Verify response versions and old-version availability while an earlier request completes.
Deliverable: A tested adapter, fixture results, artifact identities, and explicit failure policies.
4.6 Review Questions
Which checks does reload omit? What makes rollback_on_alerts return true? Why must previous artifacts remain accessible?
4.7 Applied Challenge
Implement a serialized host deployment controller with approval evidence, signed candidate admission, shared plan publication, and recovery after a partial update.
Lesson Summary
Reloading a model and authorizing a deployment are separate actions. Safe routing requires verified artifacts, retained rollback targets, controlled updates, and an explicitly operated alert loop.
Lesson status: Draft complete; ready for review. Source-checked, not execution-validated.