PeaBox Lab › PeaLang › Learn › Chapter 21 › Lesson 4

Part IV — Expert Production Engineering · Chapter 21 · Lesson 4 of 6 · 2 min read

Lesson 4: Graceful Reloads, Deployment Plans, and Automatic Rollback

Lesson level: Expert

Purpose: Reloading a model and authorizing a deployment are separate actions. Safe routing requires verified artifacts, retained rollback targets, controlled updates, and an explicitly operated alert loop.

Learning Objectives

4.1 Concepts

A safe replacement is loaded and verified before traffic routing changes. ResilientRuntime.reload loads pipeline JSON and adds the version to runtime dictionaries; it does not itself authenticate the artifact, coordinate replicas, drain old work, or guarantee an atomic governance transaction. switch_plan changes the routing plan. Keep old pipelines available until in-flight work and the rollback window are complete. These host requirements turn low-level methods into a controlled deployment.

4.2 Annotated Example

Verified host sequence: verify candidate signature and hashes; load and smoke-test the candidate; call reload with an approved path; then switch_plan to an approved DeploymentPlan. rollback_on_alerts switches to rollback_version only when should_rollback finds an open critical-severity alert and a rollback version is configured. An alert flag alone is not an autonomous monitoring loop: the application must evaluate and deliver alerts.

4.3 Guided Practice

Trace an invalid candidate, a valid candidate before routing, a canary with an open critical alert, and an acknowledged alert. Predict the active version after each step.

4.4 Common Mistakes

Do not overwrite the only good artifact, use unverified paths in reload, acknowledge a critical alert merely to suppress rollback, or assume dictionary updates synchronize replicas.

4.5 Hands-On Lab

Deliverable: A tested adapter, fixture results, artifact identities, and explicit failure policies.

4.6 Review Questions

Which checks does reload omit? What makes rollback_on_alerts return true? Why must previous artifacts remain accessible?

4.7 Applied Challenge

Implement a serialized host deployment controller with approval evidence, signed candidate admission, shared plan publication, and recovery after a partial update.

Lesson Summary

Reloading a model and authorizing a deployment are separate actions. Safe routing requires verified artifacts, retained rollback targets, controlled updates, and an explicitly operated alert loop.

Lesson status: Draft complete; ready for review. Source-checked, not execution-validated.

← Previous Next →