Strategy · 2026-11-15

The agent demo is not the product: build evidence before you ship

The agent demo is not the product: build evidence before you ship

A demo is a story; production is a contract. The moment an agent can write to your systems, quality stops being about whether it “works” and becomes about whether you can see its failures coming.

Evidence, in three layers

  1. Task success layer — did it accomplish the stated goal? Measured with deterministic checks and golden cases.
  2. Cause layer — why did it pass or fail? Capture traces: retrieved evidence, tool calls, retries, refusals, overrides and human corrections.
  3. Drift layer — when did it stop being trustworthy? Compare weekly against prior snapshots across latency, cost, refusal rate and escalation rate.

The minimum production gate

  • At least 50 golden tasks scored deterministically.
  • Trace capture for every tool call above “read-only” risk.
  • Error-channel alarms on tool saturation and refusal storms.
  • Rollback to a prior model/snapshot in under thirty minutes.
  • Weekly eval refresh because the world moves faster than your snapshots.

The quiet danger

Your boss wants “the agent” shipped yesterday. The right answer is not “not yet.” It is “give me one more week to measure three failure modes on your own data, then ship with a rollback.” Evidence is not a blocker; it is the only way to ship an agent you can defend in a postmortem.